Oosterweel link Project - closing of the Ring
around Antwerp
iNFRANEA is involved since
2005 in the tender, bafo and integral design of this 10 km long link including;
a tunnel under the river Scheldt, a double-deck cable stayed bridge over the old
harbor and 4 major interchanges.
See here for more info
on this significant project and examples of the 3D-engineering and visualisation
work we supplied to our client NORIANT-DC, the DBFM-consortium.